Drinking Water Supply
Elevated tank Dörnberg II
In 2016, IWR GmbH was tasked by Wasserbeschaffungsverband Dörnberg (WBV) with the renewal of the technical facilities of elevated tank Dörnberg II. The project included the planning and construction supervision for the rehabilitation of both the tube chamber and the water chamber in the elevated tank, the removal of the old water pipes and the ozone system as well as the replacement of the old piping with stainless steel pipes.