Extensive sewer rehabilitation completed
IWR is pleased to announce the successful completion of the extensive sewer rehabilitation work in Gevelsberg. In close cooperation with the town of Gevelsberg, a total of 1500 meters of main sewer were rehabilitated using pipe liner technology. In addition, around 270 meters of connecting pipe were renovated using the same process.
Another focus of the renovation work was the repair of 54 manholes. Various measures were successfully realized, such as the replacement of step irons, the sealing of defects, and the mineral coating.
Sustainable infrastructure maintenance
The rehabilitation measures carried out help to maintain the infrastructure in Gevelsberg in the long term. We are pleased that we have successfully completed this project and would like to thank the town of Gevelsberg for the trust they have placed in us. IWR was responsible for planning and construction supervision.
You will find our sewer rehabilitation services here.